电话
联系我们
CONTACT US
传真:0531-86370030
邮箱:870027617@qq.com
地址:济南解放东路29号
热点问题
您当前所在的位置:首页 - 新闻资讯 > 热点问题 >
防腐木花盆的制作步骤有哪些?

来源:http://www.jnajgc.com 时间:2020-07-13

济南防腐木花盆是深受园林艺术师喜爱的园林点缀元素,防腐木花架不但在园林艺术中起到美观的作用,而且其耐腐蚀的特性也是其深受喜爱的原因之一,那么防腐木花盆是怎样制作的呢?
Antiseptic wood flower rack is a kind of garden ornament element loved by garden artists. It not only plays an aesthetic role in garden art, but also its corrosion resistance is one of the reasons why it is deeply loved. How is the antiseptic wood flower shelf made?
大部分防腐木花架都是需要挖洞立柱再罐水泥,制作花架必须要两个人不等,至于技术其中一个一定要有一定能力的木匠才可以做。
Most of the antiseptic wooden flower trellis need to dig holes and then pour cement into the columns. It takes two people to make them. As for the technology, one of them must be a carpenter with certain ability.
首先需要准备的材料有:
The first materials to be prepared are:
1:一般的花架都是四根柱,两根柱横档(就是两个连着柱子的横档,因为它连接着柱子的稳定,所以称柱横档),其余在最上面的横档就看乙方怎么规定了(因为有的要宽点,有的要密点,当然如果你已经准备好上横档的摆放规格,你只能跟乙方说这是标准规格了)。
1: Generally, the flower racks are four columns and two column rungs (i.e. the two beams connected to the columns, which are called column rungs because they connect the stability of the columns). The rest of the top rungs are determined by Party B (because some of them should be wider and others should be more dense. Of course, if you have prepared the layout specification of the cross pieces, you can only tell Party B that this is the standard specification )。
2:水泥一包,小袋沙石共四袋。
2: One bag of cement and four bags of sand and gravel.
3:户外耐候木油。
3: Outdoor weather resistant wood oil.

山东济南防腐木花盆
4:移动梯架。
4: Move the ladder.
其次准备需要的工具有:
Secondly, the tools needed for preparation include:
固定切割机,移动切割机,曲线锯,角向磨光机,电钻,铁钻,铁锤(最好用锒锤,以防在水泥地挖洞做准备),水平管,水平尺,铁铲,锉刀。
Fixed cutting machine, mobile cutting machine, curve saw, angle grinder, electric drill, iron drill, hammer (preferably with a stop hammer to prepare for digging holes in cement ground), horizontal pipe, level ruler, shovel, file.
1:给所有木材都打磨一次,或者在木料都加工完以后再打摸也可以(目的就是保持表面光滑)。
1: Polish all the wood once, or touch it after it's finished (to keep the surface smooth).
2:先挖好规格所定范围内的立柱洞,一般洞挖得一样深就可以了,当然,这跟符合要求的规格来定比较规范,再者洞的宽度跟柱材的长和宽来定,比如20*20的木材做柱,那么这个洞就需要40*40,留出的空隙给罐水泥腾出一定的空间。
2: First dig the hole of the column within the scope of the specification. Generally, the hole should be excavated as deep as possible. Of course, this is more standardized with the specifications that meet the requirements. Moreover, the width of the hole is determined by the length and width of the column material. For example, if 20 * 20 wood is used as the column, the hole needs 40 * 40, and the space left will make room for the cement tank.
3:给柱子最上方锯开一个口(这个口的作用就是放柱横档,这样起到一定的稳定性),两根两根开一个方向的口,因为两根柱子连一根横档,一根横档连两个柱子。
3: Cut a hole on the top of the column (the role of this opening is to place the column rung, so as to play a certain stability), two two openings in one direction, because two columns are connected with one rail, and one rail is connected with two columns.
4:给柱横档画出你所规划上横档的每个位子的空隙,再给上横档加工,先给上横档画出一个口,也就是柱横档的宽度,画在上横档上(好比成十字型,开一个口,只是让它们都想依在一起),再用移动切割机开口,再用锉刀把口锉平整。
4: Draw the gap of each position of the upper rail you plan for the column rung, and then process the upper rail. First, draw an opening on the upper rail, that is, the width of the column rail, and draw it on the upper rail (for example, make a cross shaped opening, just let them all want to stick together), then move the cutting machine to open the hole, and then file the mouth flat with a file.
5:一般做花架为了美观都会在上横档的头开一个弯口,这时就需要曲线剧来操作了。原理很简单,自己琢磨一下就会懂了。
5: Generally, in order to make the flower stand beautiful, a curved opening will be opened at the head of the upper rung. At this time, the curvilinear play is needed to operate. The principle is very simple. You can understand it by thinking about it.
6:先给两根立柱放好柱横档,再给上面叠加开好口的上横档,先放离柱子最近的两个口,这样成一个口字趋势就可以稳定了,当然最好是给四根柱子都用木板固定住,万事都得以稳为上,毕竟是木材,扎到身上的哪个部位都不好受。
6: First put the column rungs on the two columns, and then add the top rungs with good openings on them. First, place the two openings closest to the columns. In this way, the trend can be stabilized. Of course, it is better to fix all the four columns with boards, so that everything can be stable. After all, it is wood, and it is hard to stick to any part of the body.
7:分两步来做,先罐水泥,再用梯架支撑好给上木油,一般说来,到了第二天再拆除固定的板。
7: This is done in two steps. First, cement is poured, and then the wood oil is supported by the ladder. Generally speaking, the fixed plate is removed the next day.